Actually the approval was to start the Mill, the mines are under a different permit. The mill needs to have a repository built for the "tailings" or leftover material after the precious metals are removed. The approval was to restore the permit, and start work on the new repository. Expect the work to take about 2 or 3 months. Then the mill will be able to start production and separate ore from the aggregate. The mill is an existing building, and is, for the most part, ready to go. A "drying" process will be added for the tailings. (part of the new approval that just went through today).