One by one the remaining issues about SIRG that have been posted about have been proven wrong. SIRG owns 80% of the Chloride Copper Mine. http://i1145.photobucket.com/albums/o504/Rusty_Catanz/EmeraldIslewithstufflabeled.jpg SIRG hired Paul C. Rizzo Assoc. to deal with the permitting, design the new heap leach pond (will be bigger than the old one) and re-design the pit. http://i1145.photobucket.com/albums/o504/Rusty_Catanz/PregnantSolutionPondHeapLeachpad.jpg?t=1326632132 It will take 30-45 days to build a new pond. http://i1145.photobucket.com/albums/o504/Rusty_Catanz/Sirgpitwall.jpg The old pit will begin to look like this after a few years of mining. http://www.rizzoassoc.com/cms/image2.php?url=images/stories/site/markets/D3-OpenPitMining.jpg&size=570 http://ts4.mm.bing.net/images/thumbnail.aspx?q=5037563478475375&id=95e65b242dc769ece0d1f67e99359bc6 The end product will be 99.9% pure copper.