InvestorsHub Logo

TOB

Followers 162
Posts 5764
Boards Moderated 1
Alias Born 09/15/2010

TOB

Re: 123wrc post# 260511

Tuesday, 06/26/2012 2:32:58 PM

Tuesday, June 26, 2012 2:32:58 PM

Post# of 363130
It is not only realistic, it is quite standard.

I don't believe that TOTAL owes any meter by meter information to ADDAX/SNP ...I'm sure ADDAX will receive some completed report at some time, but to think TOTAL would daily brief ADDAX on their drilling operations I do not think is realistic IMO



Addax doesn't need a daily brief, they can get the real-time data, as it happens. For example, they can be drilling in Africa and a team in Houston can be looking at all the real-time data on their control panels.

Not much different from how all of us can read posts on Ihub right after the 'submit post' button is clicked. (Its all just a series of bits and bytes that are transmitted, a collection of 0's and 1's)This is 2012, technology is very advanced.

Or they can have an engineer on the drill-ship watching over and chatting with the contractors doing the work.