Good question. Something you don't know:
1. Midway pipeline is complete.
2. Pipeline from K1 to Midway pipline, 2 in., might be completed before Friday, or within the week thereafter.
3. Pipeline to K1 costs $11K.
4. Drilling to arrive Friday to complete the K1, which should take one day, but will probably take one week to get everything straightened out."
5. "With the very high pressures at which gas is encountered in this area, substantial volumes can be transmitted by" the pipeline connected to the K1.
6. 300 additional feet of K1 were not drilled because of "unexpectedly high pressures" encountered.