Niagara Falls Facility Closure Cost Estimate

APPENDIX A


MI Inc. Niagara Falls Facility Closure Cost Estimate

Assumptions associated with the facility's closure process include the following:

1) At start of closure process the facility will have maximum permitted quantity of reactor feedstock (non hazardous solid waste) on site which is 400,000 lbs,

2) At start of closure facility will have 50,000 lbs of reactor residue (non hazardous solid waste) on site,

3) Product storage tanks (Light Naphtha — 11,000 gallons, #6 Oil — 20,000 gallons, West Diesel Oil — 12,198 gallons, and East Diesel Oil — 15,085 gallons) will be full of Naphtha product which will be sold,

4) No credit will be taken from sale of Naphtha product,

5) Disposal cost for non hazardous solid waste is $100/ton,

6) Generate 5,000 gallons of contaminated wastewater during equipment decontamination process,

7) Disposal cost for contaminated wastewater is $.50/gallon,

8) During closure process equipment and storage tanks will be decontaminated but no equipment will be removed from the site

OCR extract -
Professional Engineer (New York) Annual Inspection Report for JBI, Inc. Niagara Fails, New York Facility

This is a standard part of all of these types of reports. They are not closing - they just have to include this.