Saturday, March 03, 2012 8:56:05 AM
The fact is he hasn't sent in the application as of March 1st(see below).
You "believe" he sent in "proposals" they don't need "proposals" they need an application according to the SWP permit. Section 3 General conditions.
http://www.otcmarkets.com/edgar/GetFilingHtml?FilingID=7993976
What do you think the hold up is, is he too busy sweeping the floors or dusting the blending facility?
My email response today from Douglas E Borschel NYSDEC said as of Mar 1 there has been no application received for solid waste modification from JBI.
Credit to LV RDPD:
http://investorshub.advfn.com/boards/read_msg.aspx?message_id=72821436
One can only hope they submitted the other annual report due on March 1st. However, one can't be sure as they seem to have a problem submitting mandatory reports as written.
JBI was supposed to submitt the Process Material Thruput Report by January 30th, instead JBI said it's "confidential" we don't want the public to know how much plastic we processed and when.
Item 8.2:
Compliance Demonstration shall include the following monitoring:
Monitoring Type: WORK PRACTICE INVOLVING SPECIFIC
OPERATIONS
Monitoring Description:
Plastic is to be fed to each of the three rotary kiln
units at a maximum rate of 2,000 lbs/hour per unit, for a
total process maximum rate of 6,000 lbs/hour. Feed rate
for each unit is to be monitored electronically by a
calibrated digital scale which is linked to the facility's
computer system. Records must be maintained in a format
acceptable to the Department and an annual statement shall
be submitted verifying compliance for the previous twelve
month period.
Work Practice Type: PROCESS MATERIAL THRUPUT
Process Material: PLASTIC
Upper Permit Limit: 2000 pounds per hour
Monitoring Frequency: CONTINUOUS
Averaging Method: 1 HOUR MAXIMUM - NOT TO BE EXCEEDED AT
ANY TIME
Reporting Requirements: ANNUALLY (CALENDAR)
Reports due 30 days after the reporting period.
The initial report is due 1/30/2012.
Subsequent reports are due every 12 calendar month(s).
http://www.dec.ny.gov/dardata/boss/afs/permits/929110034800002.pdf
However, JBI never submitted the 2011 Material Thruput Report with the NY DEC. Instead he claims the amount of plastic is confidential and if they want to see it - they need to come onsite to view it. Things that make you go....Hmmmmmm
Credit to SteveF:
http://www.siliconinvestor.com/readmsg.aspx?msgid=27974946
JBI 2011 Material Thruput Report 1/30/11
Your request of 2/1/2012 has been reviewed for the above referenced records under the New York State's Freedom of Information Law (FOIL). Please note that most of our records are filed by names of individuals or corporations. We have no way of locating or retrieving records if they are filed under names or addresses other than those who have provided. If no records have been located, this does not necessarily mean, and should not be interpreted to mean that there have never been any violations, complaints, claims, investigations, or inquiries involving those names or addresses. We cannot make any representations as to whether there are or have been any such violations, complaints, claims, investigations, or inquiries.
The report you requested is kept on site at JBI and is considered Business Confidential, therefore, we do not have possession of the requested records and they are not available for public release. The Department is allowed access to the report upon request when at the site.
Thank you for your request.
Sincerely,
Julie A. Foster
Secretary I
The amount of plastic processed in 2011 is Confidential. No red flag there!
Why would the amount of plastic be confidential, could it be that it would show just how NON Continuous it really was, at the very time he was saying it was continuous?
What's funny is I used to "believe" in Santa Clause, that didn't at all make it true.
I believe the solid waste permit amendment proposals were sent in yesrterday 3/1/12 and will be reflected via NYSDEC contact next week. An annual report, per a condition of the solid waste permit, was sent in at the same time.
As for John's ego -- he deserved. He is responsible for bringing to market the first and only viable green energy processs in history. Steve Jobs, likewise, had quite an ego. They both EARNED it through hard successful value-creating work.
Last Shot Hydration Drink Announced as Official Sponsor of Red River Athletic Conference • EQLB • Jun 20, 2024 2:38 PM
ATWEC Announces Major Acquisition and Lays Out Strategic Growth Plans • ATWT • Jun 20, 2024 7:09 AM
North Bay Resources Announces Composite Assays of 0.53 and 0.44 Troy Ounces per Ton Gold in Trenches B + C at Fran Gold, British Columbia • NBRI • Jun 18, 2024 9:18 AM
VAYK Assembling New Management Team for $64 Billion Domestic Market • VAYK • Jun 18, 2024 9:00 AM
Fifty 1 Labs, Inc Announces Acquisition of Drago Knives, LLC • CAFI • Jun 18, 2024 8:45 AM
Hydromer Announces Attainment of ISO 13485 Certification • HYDI • Jun 17, 2024 9:22 AM