I believe the original conversations with Diwan stated that once the building purchase was completed it would take about six months to have the cGMP ready to produce CIDES. I seem to remember a Sept./Oct. 2012 timeframe. Up to that point, the current labs can produce sufficient materials to complete toxicology and pharmacology studies required to file the NDA. Seymour also stated that the entire lab would be fabricated off-site, trucked in, and installed in a couple of weeks. We'll see.