Just there, you are correct. In this case however, Treaty Drilling had already set surface casing in the first go around (Way back in shipment #1). This is where they used the cement in the first place. This last round was to TD or Total Depth, therefore they would not be putting away the drilling Rig until they are either 1) done or 2) something went awry. Normally the Rig would be moved to the Next site. Therefore this is also the next site. A 1500' depth well is approx 5 days each providing nothing breaks down. These are shallow basic wells, I hope they drilled or tried to drill it deeper.