Initial NI 43-101 Resource Estimate for its 100% Tabuaço Tungsten Project, Northern Portugal.
Montréal, Québec, Colt Resources Inc. (“Colt” or the “Company”) (TSXV: GTP) (FRA: P01) (OTCQX: COLTF) is pleased to announce details of an initial resource estimate for its 100% owned Tabuaço (São Pedro das Águias) tungsten project, located in the Company’s wholly owned Armamar-Meda concession in northern Portugal. The resources have been estimated by SRK Consulting (UK) Ltd (“SRKUK”) and SRK Exploration Services Ltd (“SRKES”). This has been reported in accordance with the guidelines set out by the Canadian Institute of Mining, Metallurgy and Petroleum (CIM) and detailed in the National Instrument 43-101.

Resource Estimate Highlights
? Indicated resources total 760,000 tonnes with an average grade of 0.58% WO3.
? Inferred resources total 1,330,000 tonnes with an average grade of 0.57% WO3.
? The mineralization, hosted in shallowly dipping skarn units, remains open for expansion
in several directions. Four drills are operating at the project at present to expand current resources and identify new mineralized areas.

"We are very encouraged by this initial estimate that has been focused on a portion of a larger zone of mineralization that remains open. The high grade nature of the mineralization confirms Tabuaço to be one of the highest grade, undeveloped tungsten deposits in Europe. We have an outstanding team on site and we fully intend to build upon this robust foundation in the months ahead”, said Nikolas Perrault, President and CEO.

Perrault went on to say, "We recently announced the acquisition of the surface rights (see Press release August 24th, 2011) at Tabuaço. Colt will now focus on delivering a Preliminary Economic Assessment during the first half of 2012 which will include an updated resource estimate”.

Tabuaço Resource Estimate
SRKUK and SRKES were supplied raw drilling data by Colt Resources, which have been collated by SRKES into the drillhole database, “Tabuaço-SPA_complete_drill-database_20111011”. This database has formed the basis of the geological and grade estimates presented here. All geological modelling was undertaken in Gemcom mining software (“GEMS”). In addition, SRUK have undertaken grade modelling and estimation using Isatis geostatistical software (“ISATIS”).
The following Table (Table 1) summarises the in-situ Mineral Resource, stated at a 0.3% WO3 cut-off grade, within the defined mineralisation models. In total, two domains were estimated, namely the upper and lower skarn units. Classification of the Mineral Resource is based on quality control data, geological continuity and borehole spacing. The estimate is considered to have reasonable prospects for eventual economic extraction, as it is constrained by a cut-off grade derived from reasonable underground mining and processing costs.

` The estimated Mineral Resources for the Tabuaço project are as follows:
? Indicated Mineral Resources of 760 kt at a mean grade of 0.58% WO3, which is the equivalent of 4,400 t of contained WO3; and
? Inferred Mineral Resources of 1,330 kt at a mean grade of 0.57% WO3, which is the equivalent of 7,600 t of contained WO3
Indicated Mineral Resources 760 0.58 4,400 9,700,000 440,000 Inferred Mineral Resources 1,330 0.57 7,600 16,700,000 760,000
Table 1 SRK UK -
In summary, the processes and parameters used to derive the Mineral Resource Statement are as follows:
? A cut off grade of 0.3% WO3 has been used to constrain the Mineral Resource estimate; ? This cut-off grade is based on a WO3 price of US$300/mtu, an underground mining cost of US$30/t and a processing cost of US$22/t, as supplied by SRK Denver, and agreed by Colt
Resources;
? This resource model has been wireframed using GEMS. Grade interpolation was undertaken
using Ordinary Kriging, with block model dimensions of 50m in the X direction, 50m in the Y direction and 10m in the Z direction. This is consistent with the drill spacing across the project area. No rotation parameters were applied to the block models.
? Variography and grade estimation were undertaken in ISATIS. Search ellipsoids were derived through the application of quantitative Kriging neighbourhood analysis (“QKNA”), and two search passes were used to estimate the block model; and
? The mapped fault running through the Tabuaço Project was used to limit the classification of the Mineral Resource.

All samples used for this estimate were sent by courier to OMAC Laboratories Ltd, Galway, Ireland or to ALS Laboratory Group, Seville, Spain. Samples were analyzed for W and Sn using a metaborate fusion followed by XRF analysis. Assay results for tungsten were reported by the laboratory as W%. WO3 values were calculated using a conversion factor of 1.2611.

A set of standards, duplicates and blanks is inserted by Colt into the sample stream on a regular basis in addition to the laboratory’s own internal QA/QC standards and duplicates. QA/QC results to date are well within the accepted norm.