InvestorsHub Logo
Followers 1183
Posts 134793
Boards Moderated 3
Alias Born 08/27/2003

Re: None

Friday, 10/07/2011 10:32:20 AM

Friday, October 07, 2011 10:32:20 AM

Post# of 312016
First NYSE: RKT facility ready to rock and roll apparently:

"Within ninety (90) days of the date of this Agreement, or such other time as the Parties may agree in writing, JBI shall provide Grantor with construction drawings for the AST System, the Pad and the Steel Shed (collectively, the “ Drawings ”). The Drawings shall be prepared by a professional engineer registered in the state where the RockTenn Facility is located."

Obviously the first location is determined. :)

Raw

Research & analysis on some of my favorite stocks is located on the sticky note on the SwingTrade board.

http://investorshub.advfn.com/boards/board.aspx?board_id=1781