Refering to the May artical. When that was written it was the intention for the 2nd line to open in September. There is a delay due to re-designing the Building itself due to complaints from neighbors of dust escaping from the Building. MnVap is very happy with the results from the KDS, but the dust seems to still be an issue and the plant was temporarily shut down. The problem is not specificaly with the KDS, the system itself.