InvestorsHub Logo
Followers 13
Posts 1235
Boards Moderated 1
Alias Born 03/17/2010

Re: None

Thursday, 06/09/2011 8:39:13 AM

Thursday, June 09, 2011 8:39:13 AM

Post# of 2763
ACDP Strategy; In preparation for drilling, existing seismic will be reprocessed to include the deepest target and additional seismic will be shot to pin point the well locations in order to finalize the design of a six well exploration program. The geologic highes are illustrated in the seismic photo figure x and figure y shows the cross section structure with the existing wells. Based on exploration success, a development drilling program will follow.


IT AIN'T EASY BEING GREEN!