InvestorsHub Logo
Followers 3
Posts 752
Boards Moderated 0
Alias Born 08/27/2009

Re: kownski post# 239552

Monday, 04/25/2011 9:33:23 AM

Monday, April 25, 2011 9:33:23 AM

Post# of 361414
Two things to think about - one Addax had another block they had to drill a well in by may of 2011 - I think it was OML 291 that could be where they are drilling. I have not heard anything about it since last fall.
Second Total anounced a month or so ago they were buying a FPSO for Egina & Egina South, originally they were to be tied into AKPO. This FPSO would be located just outside block 1 border & as I mentioned before Total still has two drill ships developing Egina and then Egina south. SNP was able to "borrow" the Sedco 702 to drill one well in block two when Shell was moving it from one site to another.
Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent ERHE News