Rod Braden,Mick ,from reading this I will venture a guess and say gas sales to cjhina maybe in the 3rd/4th qtr if all goes well(no pun)lol
"Yixin-2 gas well discovery ready for fracture stimulation
The Yixin-2 well has been prepared for fracture stimulation, which is scheduled for late April and is
contingent upon securing the necessary service equipment. Following fracture stimulation, production
testing at the Yixin-2 well will determine optimal rates for long-term production.
“With a successful fracture stimulation program, and following initial testing, the wells will be available
to be tied-in to the local gas-gathering system, which will allow for longer-term performance monitoring
and sales,” said Mr. Moench. “Tie-in facilities are within approximately two kilometres of both wells
and can be accomplished within a short time frame and for minimal capital cost, and we expect these
activities to culminate in reported production and associated cash flow in 2011.”