InvestorsHub Logo
Followers 3
Posts 752
Boards Moderated 0
Alias Born 08/27/2009

Re: kingpindg post# 238089

Saturday, 03/26/2011 5:22:20 PM

Saturday, March 26, 2011 5:22:20 PM

Post# of 361414
JMHO, but chevron had committed to phase two and then sold out only a couple of months before the end of phase two. Total has two drill rigs at Egina right now and I would have ask for an extension till one of them could be scheduled to go to block one - maybe when Egina was finished & before they move on to Egina South - a much smaller prospect.
With drill rigs still being hard to get and the JDA wanting Total in the JDZ it makes sence to give them some leeway on timing.
Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent ERHE News