InvestorsHub Logo
Followers 1080
Posts 106315
Boards Moderated 55
Alias Born 11/22/2003

Re: NYBob post# 38

Friday, 01/07/2011 2:12:14 PM

Friday, January 07, 2011 2:12:14 PM

Post# of 51
Eagle Plains Provides Analytical Results from Reverse Circulation Drill Program at Yellowjacket Project, Northwestern BC

Cranbrook, B.C., January 06, 2011: Eagle Plains Resources Ltd. (EPL:TSX-V) has received complete analytical results for the 2010 reverse circulation drill program at the Yellowjacket project. In the fall of 2010, Eagle Plains conducted a 64-hole drill program at the Yellowjacket property using a reverse circulation (“RC”) drill rig. A total of 2181 meters in 64 holes was completed over a 30 day period. The drilling consisted of a series of shallow, closely spaced angle holes designed to delineate mineralization and structural controls and to test an area designated for the next open pit mining phase.

RC Drill Highlights:
• L100E-60B:
• 10.19-16.28m : 6.09m @ 26.8 g/t Au
• Including 13.23-15.27m: 2.04m @ 78.71g/t Au
• Also Including 14.25-15.27m: 1.02m @ 138.26g/t Au
• L077E-48A:
• 27.68-38.85m : 11.17m at 5.83g/t Au
• Including 27.68-29.71m: 2.03m at 6.02g/t Au
• Also Including 27.68-28.69m: 1.01m at 10.53g/t Au
• Including 36.82-38.85m: 2.03m at 25.12g/t Au
• Also Including 37.84-38.85m: 1.01m at 46.63g/t Au
• L076E-18A:
• 8.07-16.81m : 8.74m @ 7.73 g/t Au
• Including 12.75-14.78m: 2.03m @ 30.48g/t Au

*intervals interpreted to approximate true thickness

http://www.eagleplains.bc.ca/

Join the InvestorsHub Community

Register for free to join our community of investors and share your ideas. You will also get access to streaming quotes, interactive charts, trades, portfolio, live options flow and more tools.