The two Hawthorne deposits have more than sufficient to make this company stock price rise quickly. What investors want to see is the actual production again on the existing mines at both locations of which one was in operation as late as 2007 by Cusac Gold and shut down then due to the gold price collapse because of Central bank gold manipulation. Cusac who I originally owned shares in then sold the who operation out to Hawthorne in a stock swap where I came into the Hawthorne shares. Hawthorne needs to get off its ass and quit drilling and start producing again with the now high gold prices and then in conjunction with the mining do the drilling. They have great resources to drive the stock prices into the $100 plus level in the next two years, they just need to become a producers again which is easy for them because the whole operation is just sitting there. The current price for a company like this is ridiculously low. When the investment public sees this one the price will jump over night to over a dollar and points north of that in the months following.

TABLE MOUNTAIN PROPERTY
Liard Mining District
British Columbia

Prepared for
HAWTHORNE GOLD CORP.
Vancouver, B.C. Canada
Report for NI 43-101
May 18th, 2010

Cassiar Gold Camp = Table Mountain property and Taurus Property

The Table Mountain Property is comprised of 106 contiguous mineral claims and 12 Crown Grants,
covering an area of 37,123 hectares. These claims are located in the Liard Mining District of
northwestern British Columbia, some 117 km north of Dease Lake, B. C. The Property is centered on a 15 km long, northerly trending system of mesothermal gold-bearing shear zones and quartz veins. This gold rich system developed in late Jurassic age, along and adjacent to the Erickson Creek Fault Zone. The mineralised system on the Table Mountain property hosts a number of past producing, high
grade underground mines, open pits and placer workings. Estimated total gold production from this
property is 316,000 oz (9,828 kg), with an additional 35,000 oz (1,089 kg) reported production from
the adjoining Taurus Property (also owned by Hawthorne Gold). These two properties combined are
known as the Cassiar Gold Camp. In addition, placer gold production in the Cassiar Gold Camp has
been estimated at 74,500 oz (2,317 kg) Total gold production for the Cassiar Gold Camp is calculated
at over 425,000 ounces (13,219 kg)
Hawthorne Gold Corp. presently controls the majority of the mining claims in the Cassiar Gold
Camp, Liard Mining District, NTS 104P. Hawthorne claims comprise two properties; the Table Mountain Gold Property and the Taurus Property . There are 106 claims on the Table
Mountain Property owned by Hawthorne Gold Corp. including those acquired through the merger
with Cusac Gold Mines . Twelve Crown Grants located on the Table Mountain property .
Hawthorne Gold Corp. controls the mineral rights to a total of 59,165 hectares (146,200 acres) in the
Cassiar Gold District. Hawthorne’s Table Mountain Gold property mineral claims cover
approximately 39,183 hectares and are contiguous. Hawthorne’s adjacent Taurus Property covers
19,982 hectares. The claim group purchased from American Bonanza Gold Corp. covers 915
hectares. The properties have been acquired by direct staking, outright purchase, and option
agreements. Most of the claims are owned outright, with only a few subject to option payments
and net smelter royalties, or net profit interests.

The total recorded production for the entire Cassiar Gold Camp, (Table Mountain, Taurus and Placer
operations) is 425,151 oz (13,224 kg).

October 2010 Corporate presentation http://www.hawthornegold.com/

http://www.hawthornegold.com/i/pdf/HGC-Corporate-Presentation.pdf TSX-V: Oct 2010
Experienced Management , Operational and Technical Team
•Led by respected company builders Michael Beley and Richard Barclay
?Co-founded both Bema Gold and Eldorado Gold
•Strong board of directors and advisory team

Dedicated to Growth through drilling, development and acquisitions
•Apply Bema/Eldorado Model (short term cashflow)
?Advance towards cashflowat profitable mining operation within 4 years from Company inception
?On track for production at Cassiar Gold Mine, British Columbia
•Aggressive 10,000 metre diamond drill program at Cassiar Gold Camp 2010
?Build resource portfolio and develop priority exploration targets for upside potential


Issued and Outstanding82,115,113
Special Warrants ($0.29)14,338,801
Stock Options ($0.40 -$1.60)6,787,000
Warrants ($0.40 -$0.51)11,342,857
Fully Diluted114,583,791
American Bonanza Gold Corp.5,750,000~(8%)
Institutional Ownership~25,000,000~(26%)
Market Capitalization (as at April 29, 2010) ~$13M
HGC
UTable Mountain and Taurus Deposits
Progress To Date
•Increased land position by 245%
•Purchased remaining 70% of Taurus Deposit
•Completed geological compilation model of 40 years of data
•Completed 12,000 metre surface diamond drill program 2008/9
•Rehabilitated underground access workings at Cassiar Gold Mine
•Re-established exploration and mining 75 man camp
•Completed property-wide geophysics program
SHigh-Grade Gold System
•NI 43-101 Mineral Resource Estimate
•Deposits hosted in extensive quartz-carbonate-gold vein systems similar to some of Canada’s largest gold camps, including Timmins, Kirkland Lake and Val d’Or

2009 Exploration & Development Program
•Completed 12,000 metre diamond drill program focused on:
?Priority zones identified at Table Mountain and Taurus that will increase resource base
?Regional targets to identify new zones
•Underground pre-development at Table Mountain to prepare for production at Cassiar Gold Mine

Taurus Gold Deposit24Highlights
•NI 43-101 Mineral Resource Estimate
•High-grade zones identified within resource selected high grade open pits
•Open pit, bulk tonnage opportunity
•Historical production of 32,700 ounces from high grade zones within deposit 2010 Exploration & Development Program
•Plan 2010 10,000 meter surface exploration drill program to bring Taurus inferred resource to measured and indicated status
•Metallurgical studies on mineralized zones for compatibility with mill flow sheet
•Potential for multi million ounce open pit and underground bulk mineable gold deposit
Oro

TABLE MOUNTAIN AND TAURUS GOLD DEPOSIT
•Continue resource development through surface drilling during 2010 summer/fall; exploration program will consist of 10,000 metres of diamond drilling, trenching, mapping and soil sampling

•Complete engineering and mine planning

•Complete pre-production mine development leading towards production at Cassiar Gold Mine