InvestorsHub Logo
Followers 3
Posts 128
Boards Moderated 0
Alias Born 07/01/2009

Re: Sirius_Fan post# 113228

Tuesday, 12/07/2010 2:32:33 PM

Tuesday, December 07, 2010 2:32:33 PM

Post# of 233386
My take on this is as follows -

HC results were expedited according to KATX PR -
nothing noted as to RR being expedited from anything
I read PUBLICLY FROM THE COMPANY.

HC tallied 1200 plus meters drilled in 12 holes
RR tallied 1000 meters in 2 holes
200 meter difference in drilling - 10 less holes

If HC results came back from 12 holes in 3 weeks after being expedited for total of 1200 plus meters drilled, then RR results (which was not listed as expedited) should be back this week at the latest especially with less to analyze we should have received these by now or Friday at latest based on the prior discussion regarding expediting results cuts only one week off for results to be published as HC was being discussed at that time as well as 1/3rd less amount of drilling to analyze.

But I also "assume" it takes less time to analyze, log and separate 2 holes than it does to log, analyze and seperate 12 holes too.

And yes, certain things said may indeed come to fruition.