InvestorsHub Logo
Followers 74
Posts 7117
Boards Moderated 0
Alias Born 03/31/2010

Re: Cee-It post# 8162

Tuesday, 11/23/2010 11:47:41 AM

Tuesday, November 23, 2010 11:47:41 AM

Post# of 23465
To my knowledge nobody has pointed out that the IP will be done in 3 separate grids,apparently in 3 separate areas.
Thus they could concentrate on the primary area to get it done first as insurance against the winter weather closing in before the primary area is tested.

From the PR:
"The IP survey will be conducted on three separate grids. The main grid includes known surface showings and some drillhole intersections of disseminated copper. The second grid will cover an airborne electromagnetic anomaly that has not yet been drill-tested. The third grid will cover a malachite showing that returned high copper values."
Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent WOLV News