Exploration and Resources in Section 1.2.3

Engineering 
The  2010  engineering  program  is  designed  to  assess  a  range  of  options  to  optimize  the  project 
scale,  including: trade-off studies of major project components; metallurgical studies to determine 
the  optimal  conventional  processing  systems  and  designs;  and  evaluations of the major 
infrastructure  elements  to  identify  the  optimum  alternatives  and  designs  for  these  project 
components.  
During the third quarter, the scope of work for the 2011 work program was developed. 

Metallurgy 

The next round of metallurgical testwork started at the beginning of the quarter, and commenced 
with the preparation of 104 new variability samples from untested 2008 Pebble West metallurgical 
drill core.  

Additional  comminution  tests  were  conducted  to  expand  the  grinding  parameter  database  for 
future modeling purposes.  In total, slightly more than 140 tests of various types were completed on 
samples from untested 2008 metallurgical drill core. 
A total of 236 additional variability composites  from the Pebble East and Pebble West areas were 
submitted  for mineralogy  studies  using  scanning  electron  techniques.  The purpose of this work 
was  to  assist  in  the  development    of  the  geometallurgical model,  and  to  group  the metallurgical 
variability samples into their respective domain types. 
Copper speciation data was incorporated into the block model as  previous  metallurgical  work 
found  copper  speciation  to  be  an  important  variable  in  the  predictive  recovery  equations  for 
copper, gold and molybdenum. 
Flotation  optimization  testwork  was  conducted  on  previously  tested  variability  samples  that 
displayed  lower  than  expected  molybdenum  recoveries.    Samples  representing  a  range  of 
molybdenum head grades and clay content were selected. The optimisation work shows improved 
molybdenum recovery with increased reagent dosage.    
Flotation batch and  locked-cycle testwork began on samples from untested portions  in the Pebble 
East area.  Seven new samples were tested during the period.  Data collected from this work will be 
used to update the predictive recovery equations for copper, gold and molybdenum.  Initial results 
are similar to previous flotation testwork for Pebble East.   Additional samples will be tested in the 
fourth quarter. 

Viscosity testwork was also completed which examined the behavior of pulps with varying clay and 
solids content.  The purpose of this work was to assist in the  verification  of  the  maximum 
volumetric  throughput  limit  for  semi-autogenous grinding.   Results of  this work will be available 
during the next reporting period. 

Four two-tonne test composites were prepared from the present inventory of Pebble East and West 
metallurgical variability samples for continuous flotation testwork.  The composites were prepared 
to represent the four major geometallurgical domain types in the deposit. The purpose of this work 
is to provide a product for future testwork, to evaluate the potential of gravity recovery within the 
regrind  circuit,  and  to  confirm  the  laboratory-scale  recoveries  from  locked-cycle  tests.    Work 
conducted  in  September  focused  on  commissioning  the  continuous  flotation  plant.    A  10-tonne 
commissioning sample, consisting of grinding reject material  from Pebble West, was used for this 
purpose.  The actual testwork commenced toward the end of the quarter.  Results from the domain 
samples will be available during the next reporting period. 

The investment strategies/thoughts expressed here are my opinions alone. E-E stands for non Encrypted-English.

Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent LBSR News