InvestorsHub Logo
Followers 24
Posts 15456
Boards Moderated 0
Alias Born 12/30/2001

Re: wbmw post# 1799

Friday, 10/18/2002 1:18:18 PM

Friday, October 18, 2002 1:18:18 PM

Post# of 151692
wbmw -

those die cost estimates are going to include packaging and test as well.

I don't think so. Then they'd be called unit cost, but either way the numbers are way out of line. Standard yield models would have Willamette yielding over 70 GDPW. At $2000 per wafer then the die cost would be $28.50. It would take over $70 for packaging and test to arrive at his numbers. That's an order of magnitude out of line.

EP


Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent INTC News