http://www.desertenergyproject.net/Feasibility_Study%201.pdf Feasibility Study Part 1 1 GW/h Power Plant Costs of the Project Initial plan to built a plant of 1 Gigawatt Photovoltaic array in 4 construction phases: Construction Capacity Modules Area km² Completion Cost M Euros Phase 1 100 MW 570 000 2,6 2009 520 Phase 2 300 MW 1.710 000 7,8 2010 1.410 Phase 3 300 MW 1.710 000 7,8 2011 1.410 Phase 4 300 MW 1.710 000 7,8 2012 1.410 Total 1 GW 5.700 000 26 2012 4.750 It is recommended to install the mentioned four groups of arrays in the north of Saudi Arabia covering a total area of 26 km², or otherwise for a best location. Detailed Costs First Phase: 100 MW PV modules 370 000 000 EUR Planing, supervision, geologic tests 50 000 000 EUR Construction and supplements 300 000 000 EUR [2] Transmission and cable to Europe 550 000 000 EUR 1 420 000 000 EUR Phase 2, 3 and 4: 300 MW each PV modules 3 330 000 000 EUR Construction and supplements 2 500 000 000 EUR Total Cost of 1 GigaWatt Plant 7 250 000 000 EUR Pay off Pay off in the Sunbelt 10 years [1] Operating life guarantee of 25 years +5 % The actual price of 1 kW/h in Europe is 0.19 EUR/kWh The first 30 Terra Watt will cost 0.19 EUR/kWh The net export price to Europe will then be 0.07 EUR/kWh Total production in 25 years 75 TerraWatt/h 75 TW 0,19 Euro 14.25 Billion Euro Total Cost Phase 1 to 4 7.25 Billion Euro Nett gain 7.00 Billion Euro
Register for free to join our community of investors and share your ideas. You will also get access to streaming quotes, interactive charts, trades, portfolio, live options flow and more tools.