InvestorsHub Logo
Followers 1
Posts 70
Boards Moderated 0
Alias Born 11/29/2008

Re: kenjays post# 178

Thursday, 07/29/2010 1:58:55 PM

Thursday, July 29, 2010 1:58:55 PM

Post# of 2988
The last two stroke testing that they had a problem with was suppose to taken 30-45 days at the independent lab they were going to use at the time, the name of the lab now I cannot remember, but it was suppose to be 30-45 days before they started to have a problem with the substrate which caused EVCC to shut that testing down and go back and figure out the new substrate design. The catalytic converter already works better than it even needs to. The substrate problem was causing the engine to build up to much back pressure, which that is all they needed to fix by all that I have read and understand to be the truth.