It takes 2 weeks to move a rig from Australia to Tasmania, some more time to move to the site and this was done several times in the past 6 months with the Hunt rig for Michael Roberts that was used on the property Malcolm gave up and they used a divining rod to determine where to drill. What a joke. These people are suppose to be professionals.
The new rig will take about 6 weeks to reach Tasmania + quarantine + a short run to the site because this is a mobil rig and transportation over the road is very fast compared to old style rigs.
The actual drilling at Bellevue will take place using a choice of several rigs. The new rig will drill to a depth of 15,000 feet and may not be needed but should that change its a quick swap and set up. The rigs to start will drill to 9 to 10,000 feet.
As far as the scientific process used to determine the quantity of oil in the pool that is sampled that's not my bag. Its why we have expert oil people doing the work and management of the property.
The company that EEGC will have a joint venture are world renowned and have many experts to do what ever is determined to be done and not the Mickey Mouse operations that are conducted by Hunt. The company chosen will be honorable and perform the tasks they are suppose to do in a timely manor.

This is only my opinion!