InvestorsHub Logo
Followers 4
Posts 123
Boards Moderated 0
Alias Born 03/25/2010

Re: kdd post# 15573

Sunday, 07/11/2010 11:18:21 PM

Sunday, July 11, 2010 11:18:21 PM

Post# of 64476
It's OK. I feel much more comfortable talking about this then behind the scenes financial dealings that I do not have full disclosure ability to discuss.

Step 1: injectivity test on each individual well to gauge maximum volume of gas injectable over a 6/12/24 hour period.

Step 2: Inject in 3 to 5 wells at a time dependant on injection system volume over a 6/12/24 hour period. Then move to next 3 to 5 wells, then next 3 to 5 wells, etc

Step 3: Determine suitable gas flood well based on previous tests (could be multiple flood wells dependant on total well count) and inject for days, weeks or months at a time. Could also be 24/7/365 assuming the flood well is properly engineered to accept all of the gas volume injected.

Hope that made sense. I'll try and post a better explanation on the website.