- The stock prices in the above table are defined and calculated in the same manner as those in 1/3/05 09:36 post #8901185.
- Note that the Shore go-it-alone column reflects potential stock prices years down the road. Also, I would anticipate that the stock prices would actually be a little lower than those shown in the table above do to the need to issue additional stock to fund the prefeasibility study and other operational costs.
- I also caution, that in my opinion, the bulk sample probably has a higher grade and valuation than the average of the Star site as it was targeted for high diamond concentration.
- The minimum valuation required to economically justify the project is about: $90/carat with a 0.13 carat/tonne grade $70/carat with a 0.17 carat/tonne grade