InvestorsHub Logo
Followers 1
Posts 65
Boards Moderated 0
Alias Born 06/10/2010

Re: Makesomemoney post# 5073

Friday, 06/18/2010 11:53:17 AM

Friday, June 18, 2010 11:53:17 AM

Post# of 26333
This is an application for KC9000 that has some possible validity to it. No specialized equipment is needed to work with the solvent technology. Does anyone know how much KC9000 costs per barrel (55 gal. drum)? The economics are key. Have there been any downhole tests to determine the economics and use protocols? Waterfloods involve complex engineering and can take up to a year before one sees the water reach the well bore and any results. This application resembles a waterflood.

Has KC9000 been approved an an injection product by the Texas Railroad Commission (the entity in Texas that regulates the Oil & Gas Industry)?

Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent FHLD News