InvestorsHub Logo
Followers 25
Posts 2359
Boards Moderated 4
Alias Born 05/04/2009

Re: None

Friday, 04/09/2010 4:18:49 PM

Friday, April 09, 2010 4:18:49 PM

Post# of 312025
John Bordynuik: Must Read "Will permits and licences be ready to go when P2O is?" For the state of NY, yes. For other states we will seek the assistance of URS. Our FL P2O management team has used URS many times in the past for permitting for their projects. "If they are not will this be a major road block for P2O roll out?" I don't see it as a major road block. We have 3 thinks going for us: 1) The process does not pollute. 2) We are not handling hazardous waste material (medical waste is a different category) 3) Our residue can go in landfill 4) Our system is close-looped (as you will see at the AGM) so we have no wste water and 5) our emissions do not pollute*** "Is each State different?" Yes. That is the reason for URS. "With proper filtering in place will permits even be necessary?" I believe what will shock the hell out of you at the AGM is that our 20 ton processor does NOT have or require a scrubber on its stack smile No filters. I do want to point out this is for processing unwashed non-hazardous mixed plastic waste. Medical waste is a totally different situation and we would need filters.

Chillin' out, maxin' relaxing all cool.