This is what's missing... Incomplete Industrial Wastewater DIscharge - Missing Town Signature - Missing Fee Incomplete Sewer Connection Permit - Missing Town Signature - Missing Design Drawings - Missing Technical Specs - Missing Review Fee www.nhsec.nh.gov/2009-02/documents/100113deswd_determination.pdf Link to Incompletion Letter This looks to me like a 1-2 month turn around for re-application, depending on design drawing time by an engineering firm. I would look toward the Mass. PR before this one. This PR will generate revenue and will be much more significant in my opinion.