This is what's missing...

Incomplete Industrial Wastewater DIscharge
- Missing Town Signature
- Missing Fee

Incomplete Sewer Connection Permit
- Missing Town Signature
- Missing Design Drawings
- Missing Technical Specs
- Missing Review Fee

Link to Incompletion Letter

This looks to me like a 1-2 month turn around for re-application, depending on design drawing time by an engineering firm.

I would look toward the Mass. PR before this one. This PR will generate revenue and will be much more significant in my opinion.