InvestorsHub Logo
Followers 4
Posts 320
Boards Moderated 0
Alias Born 09/10/2009

Re: None

Saturday, 12/05/2009 12:24:15 PM

Saturday, December 05, 2009 12:24:15 PM

Post# of 361655
The Malanza 1X is the fourth well drilled during the current campaign, which encompasses JDZ Blocks 2, 3 and 4. It is the second well drilled in JDZ Block 4, in which ERHC has a 19.5 percent interest.
"We are thrilled that the drilling campaign continues to progress on schedule and we look forward to the release of comprehensive drilling results when the operators complete their analyses," said Peter Ntephe, chief operating officer with ERHC.
Last week, Addax finished drilling a well at the Lemba 1X prospect in JDZ Block 3 in which ERHC has a 10 percent interest. A comprehensive analysis that incorporates the drilling results into relevant geologic and fluid models will now be carried out.

If Malanza is finished, and moving to another sigh, an update would be good before DEC. 15.