Hopefully with my minute knowledge of this space I got some things below correct as positive info for this BB.

http://www.ng.total.com/04_total_nigeria_activities/0405_cases_study.htm

http://www.ng.total.com/media/pdf/total_gas_monetization.pdf

http://www.ng.total.com/media/pdf/total_gas_monetization.pdf

http://www.ng.total.com/media/pdf/total_gas_monetization.pdf

Akpo: deep offshore expertise

The Akpo field is scheduled to start producing by 2008, eight
years after its discovery. This additional production will provide
new evidence of the Group’s capacity to meet the technological
challenges of deep offshore, an area in which Total’s
track record already ranks it among world leaders. The largescale
development project led by Total, as technical advisor
for the OPL 246 joint venture, calls for the drilling of 44 wells
(22 producers, 20 water injectors and two gas injectors) in
water depths ranging from 1,300 to 1,500 metres. Steel catenary
risers at the forefront of technological innovation will
be installed to convey fluids up to the topsides installed on
an FPSO (Floating Production, Storage and Offloading vessel)
with a storage capacity of two million barrels. This huge
development will enable the EPNL/NNPC joint venture to
meet its share of the associated gas supply commitment for
NLNG train 6. Exported to the Amenam/Kpono gas hub via a
150-kilometre subsea pipeline, the gas from Akpo will allow
the monetization of significant quantities of gas at Bonny.