InvestorsHub Logo
Followers 4
Posts 463
Boards Moderated 0
Alias Born 06/30/2009

Re: nascar1nj post# 35385

Friday, 09/04/2009 6:01:03 AM

Friday, September 04, 2009 6:01:03 AM

Post# of 42520
The alternative method is them piping their natural gas to a collection station where it is then trucked to a place to be blended and sent to market. It is costlier for citizen gas to do that than to have the direct blending. That's why I tried the direct blending in the first place.

1: Sideways at 3 x 4 as usual.

2: News about all of the natural gas wells have been successfully connected via pipe to the collection station. PPS spikes to .002 - .003

3: PPS pulls back waiting for the production numbers, which come in a timely manner because flow is easily stabilized for all wells one at a time as they are plugged in. No blending = no trouble ascertaining flow.

4: Numbers come out a couple weeks after Well connection completion PR was issued. PPS has the final breakout and ascends above resistance.