InvestorsHub Logo
Followers 20
Posts 5518
Boards Moderated 0
Alias Born 05/28/2005

Re: kownski post# 177227

Friday, 08/28/2009 9:42:38 PM

Friday, August 28, 2009 9:42:38 PM

Post# of 361693
kownski...here is the photo of the 36" pipe....

being loaded on the tug to be carried out to the drillship.



The operator of Joint Development Zone Block 4, Addax Petroleum, has provided ERHC with this photo of operations at the company's shore base in Onne Port in Nigeria. The picture load out of the 36 inch conductor. As of a few days ago, the Deepwater Pathfinder was in the process of leaving for Equatorial Guinea where it will undergo a survey of its hull. The plan was for Addax's work boats to rendezvous with the Deepwater Pathfinder along its journey to off load materials so operations can commence immediately upon its arrival in Block 4 in the next week or so.
Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent ERHE News