InvestorsHub Logo
Followers 46
Posts 3982
Boards Moderated 0
Alias Born 12/15/2006

Re: spec machine post# 92027

Tuesday, 07/28/2009 2:25:16 PM

Tuesday, July 28, 2009 2:25:16 PM

Post# of 107353
Looks like they need a few more:

The ADCP buoy and integral handling frame is the primary component of the TAO Project's subsurface upper ocean current data collection mooring. The ADCP buoy is a spherical float that provides underwater flotation and has a special instrument well to mount the RDIffeledyne Workhorse Long Ranger ADCP. The integral frame is inserted through holes in the sphere and acts as the strength member and skeleton to support the flotation, as well as an attachment point to tether it to the bottom. The frame also provides mounting pads for attaching additional instrumentation for measuring salinity, temperature, and depth. The 5 new ADCP buoys & frames are needed for new deployment sites in the build-up of the Indian Ocean "RAMA" Observational Array. The current data from these moorings will be used to measure ocean climate processes with an emphasis on the Indian Ocean seasonal monsoonal cycle and the Madden Julian Oscillation, which can be a precursor for EI Nino in the Tropical Pacific. There will be a total of 12 ADCP mooring sites that will be maintained by the TAO Project in the Indian Ocean. These 5 buoys are scheduled for deployment in early 2010 and will be shipped to India in November of 2009. Items will be shipped using government bill of lading and must be delivered to NOAA Facility Seattle, WA by Oct 16, 2009.

My posts are my opinions. Always dd to your own comfort level.

Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent KLNG News