InvestorsHub Logo
Followers 0
Posts 2268
Boards Moderated 0
Alias Born 05/08/2009

Re: None

Thursday, 07/23/2009 12:10:12 PM

Thursday, July 23, 2009 12:10:12 PM

Post# of 35619
Following ITT successful field test of the joint contaminated surface detector (JCSD), here is the next stage details (released in May 09) (with minor additions from me with DD from other US Army websites):

See Page 21 & 22:
http://74.125.153.132/search?q=cache:BiYUZzAGVkkJ:www.jpeocbd.osd.mil/packs/DocHandler.ashx%3FDocId%3D2857+joint+contaminated+surface+detector&cd=30&hl=en&ct=clnk&gl=sg

•Program Overview Laser-Based Non-Contact Surface Detector
–Effort Description:
•Transition CUGR ACTD (COMPLETED) to Acquisition in FY09
–Schedule: FY10-FY15
–Acquisition Approach:
•Full and Open Competition
•Multiple Prototypes Leading to EMD (Engineering and Manufacturing Development)

•Program Acquisition Strategy
–Market Research Ongoing (Jun / Jul 09)
–RFP 4QFY09

Page 39 :
OPPORTUNITY
Joint Contaminated Surface Detector (JCSD)
–Prototypes with Options for EMD (Engineering and Manufacturing Development) & Production
4QFY09


If i'm not wrong, 4QFY09 is 1 Jul 09 to 30 Sep 09 (summer 09). No wonder Bob Battis keeps indicating he expects to deliver the smaller-sized prototype to ITT / US Army in summer 09 (for the Acquisition Programme?).

Looking great! If the ITT / LNGT JCSD is accepted under the Acquisition Programme in 4QFY09 (now), the next stage would be production, and then installation into the various military vehicles.