Tuesday, July 07, 2009 9:34:35 PM
The 702 finished logging (as identified) and set the liner for BG a little over a week ago. The rig was released back to Snepco the same week. The rig is currently drilling its first of two top hole sections (on a deep-water production template). It is scheduled to arrive in the JDZ (on location) around +/- the 5th of Aug.
The Pathfinder is due to be loaded out (additional equipment) for JDZ operations the same week in PH... If it stays on track; drilling will begin +/- 5-10 days after load out.
Addax - not Sinopec - is currently handling and overseeing the planning stages of the load out of the Pathfinder... One can assume based on this that Addax drilling management will manage drilling operations.
Both rigs should be drilling by the third week of Aug.
Block 3 operator is monitoring... (with the right to change their mind about drilling operator)
Of course when drilling begins; tight hole criteria will be in affect.
I hope this answers a few private questions.
Disclaimer statement: whip the cat... not the pup.
Pup
Recent ERHE News
- Form SC 13G - Statement of acquisition of beneficial ownership by individuals • Edgar (US Regulatory) • 02/06/2024 07:31:22 PM
- Form 8-K - Current report • Edgar (US Regulatory) • 12/08/2023 09:06:42 PM
Unitronix Corp Advances DeFi Innovation with Tokenized Real-World Assets Integration • UTRX • Oct 17, 2024 7:38 AM
Mass Megawatts Commences Solar Energy Sales Efforts • MMMW • Oct 16, 2024 7:45 AM
SANUWAVE Health Announces 1-For-375 Reverse Stock Split • SNWV • Oct 16, 2024 7:40 AM
Future Hospitality Ventures Unveils Bold, New AI-Driven Initiative to Revolutionize the $300 Billion Hospitality Market • NGTF • Oct 16, 2024 7:07 AM
Kona Gold Beverages, Inc. Announces Strategic Progress and Corporate Evolution • KGKG • Oct 15, 2024 9:00 AM
One World Products Secures First Order for Hemp-Based Reusable Containers, Pioneers Renewable Materials for the Automotive Industry • OWPC • Oct 15, 2024 8:35 AM