InvestorsHub Logo
Followers 35
Posts 12463
Boards Moderated 8
Alias Born 12/17/2002

Re: None

Monday, 10/06/2008 10:00:06 PM

Monday, October 06, 2008 10:00:06 PM

Post# of 333

El Nino drills 2.82% Cu over 29 m at Kasala project


2008-10-06 09:53 ET - News Release

Mr. Jean Luc Roy reports

EL NINO VENTURES INC. MAKES SIGNIFICANT COPPER/COBALT DISCOVERY (29 METERS AT 2.82% CU AND 0.34% CO) IN THE DEMOCRATIC REPUBLIC OF CONGO

El Nino Ventures Inc. has made a significant copper/cobalt discovery on its research permit PR 5214, located in southeastern Katanga province in the Democratic Republic of Congo. This area has now been dubbed the Kasala project.

The discovery was made during the course of the company's 10,000-metre reverse circulation (RC) drilling program, when an RC drill hole, MDB-023, was completed in the central northern area of PR 5214.

Company geologists reported the presence of malachite mineralization over a wide interval in the drill cuttings from this hole. MDB-023 (minus-45 degrees) ended at 97 m due to difficult ground conditions.

Samples from MDB-023 were collected using strict quality controls and were then dispatched to ALS Chemex Laboratories in Johannesburg, South Africa, for sample preparation and assay. Analytical results received from ALS Chemex indicate a 29 m intersection grading 2.82 per cent Cu between 17 and 46 m, which includes an intersection of 4.11 per cent Cu and 0.50 per cent Co between 21 and 26 m.

Drill highlights of hole MDB-023 can be found at the company's website.

Since the completion of hole MDB-023, an additional 47 holes have been drilled in the Kasala area, 19 diamond drill holes (DDH) and 29 reverse circulation holes (RC). Company geologists report visible malachite mineralization (ranging from weak to very strong over varying thicknesses) in 31 of the 48 holes drilled in this area. The strike length of this discovery stands at approximately 800 m at present. Drilling has been halted for the time being in order for the company to compile and analyze the substantial assay data which are expected to be received over the next four to six weeks.

An induced polarization (IP) ground geophysical survey is now under way in the Kasala area to trace possible extensions of the mineralized zone. All information gathered over the next six to eight weeks will be compiled and analyzed by the company's technical team to plan additional drilling in this area. Remaining samples from the other mineralized drill holes completed in this area are being shipped to the ALS Chemex facilities in Johannesburg where they will be analyzed. The company has requested that ALS Chemex perform priority analysis of these samples.

Research permits 5215 and 5217

Two other target areas on PR 5215 and PR 5217, respectively, were tested during the company's 10,000 m RC scope drilling program without significant results. Thirty RC holes totalling 3,215 m were drilled on PR 5217 and 23 RC holes totalling 1,995 m were drilled on PR 5215. Analytical results have been received from ALS Chemex for 21 of the 32 holes drilled on PR 5127 and for five of the 23 holes drilled on PR 5215 with no significant results reported. Analytical results are awaited for the remaining 29 drill holes. No further drilling is currently planned for on these two research permits. The company will compile all results from this year's campaign and plans further geochemical and geophysical surveys to generate new targets on these two permits.

Jean Luc Roy, president and chief executive officer of El Nino, states: "This discovery on our Kasala project is very significant and we feel that when all assay results are returned the company will have a substantial project to work on, over the next drill season. The grades and thicknesses on our findings are very encouraging and we look forward to sharing results from other drill holes on the Kasala project, over the next four to six weeks."

The content of this press release has been reviewed by Benoit M. Violette, Geo, consulting geologist and the qualified person under NI 43-101.



DRILLING SUMMARY -- KASALA PROJECT

Hole Id Depth (m) From (m) To (m) Interval (m) Copper (Cu) Cobalt (Co)


 
MDB-DD-006 150.0 Assays pending
MDB-DD-007 195.7 Assays pending
MDB-DD-008 122.3 Assays pending
MDB-DD-009 128.0 Assays pending
MDB-DD-010 150.7 Assays pending
MDB-DD-011A 109.0 Assays pending
MDB-DD-011B 144.8 Assays pending
MDB-DD-012 146.8 Assays pending
MDB-DD-013 150.0 Assays pending
MDB-DD-014 150.0 Assays pending
MDB-DD-015 250.0 Assays pending
MDB-DD-016 187.3 Assays pending
MDB-DD-017 161.3 Assays pending
MDB-DD-018 167.3 Assays pending
MDB-DD-019 213.0 Assays pending
MDB-023 97.0 17 97 80 1.42% 0.13%
including 17 46 29 2.82% 0.34%
including 21 26 5 4.11% 0.50%
MDB-024 53.0 Assays pending
MDB-025 100.0 Assays pending
MDB-026 47.0 Assays pending
MDB-027 100.0 Assays pending
MDB-028 100.0 Assays pending
MDB-029 89.0 Assays pending
MDB-030 100.0 Assays pending
MDB-031 56.0 Assays pending
MDB-032 96.0 Assays pending
MDB-033 100.0 Assays pending
MDB-034 100.0 Assays pending
MDB-035 100.0 Assays pending
MDB-036 45.0 Assays pending
MDB-037 61.0 Assays pending
MDB-038 100.0 Assays pending
MDB-039 73.0 Assays pending
MDB-040 100.0 Assays pending
MDB-041 100.0 Assays pending
MDB-042 100.0 Assays pending
MDB-043 100.0 Assays pending
MDB-044 100.0 Assays pending
MDB-045 83.0 Assays pending
MDB-046 89.0 Assays pending
MDB-047 85.0 Assays pending
MDB-048 100.0 Assays pending
MDB-049 100.0 Assays pending
MDB-050 109.0 Assays pending
MDB-051 149.0 Assays pending
MDB-052 77.0 Assays pending
MDB-053 83.0 Assays pending
MDB-054 150.0 Assays pending
MDB-055 150.0 Assays pending


Ed

Join the InvestorsHub Community

Register for free to join our community of investors and share your ideas. You will also get access to streaming quotes, interactive charts, trades, portfolio, live options flow and more tools.