......."The system will have a design capacity of 25,000 tonnes per day with the initial throughput planned at 5,000 tonnes per day.

<<
The Enhance CO(2) Pipeline System will consist of:

- drying and compression facilities at the north end in the Heartland
Industrial Region on the Agrium and North West Upgrader sites, which
will process the CO(2) that will be collected and bring the product
up to pipeline specifications;

- a pump station east of Fort Saskatchewan in the Heartland Industrial
Region, to be called the Elk Island Pump Station, that will boost
pressure on the pipeline system;

- the pipeline operations and control centre located at the Elk Island
Pump Station;

- receipt facilities at the south end of the system near Clive, which
will allow distribution of the CO(2) to the conventional oil and gas
fields in the area; and

- a high vapour pressure (HVP) pipeline between the source and the
delivery point, connecting the north and south facilities.
>>

Enhance anticipates regulatory applications for the proposed project to be completed by spring of 2009, and depending on the timing of regulatory approval, construction is expected by the end of 2009, with operational startup in 2011. ......"