![](http://investorshub.advfn.com/images/default_ih_profile2_4848.jpg?cb=0)
Sunday, February 17, 2008 6:28:07 PM
2) Joint Development Zone (JDZ) Block 2. 8.75% WI. Operator Sinopec
The JDZ is the boundary between Sao Tome and Principe and Nigeria, divided into Blocks. An EEL/ONGC JV was awarded 15% of Block 2 (EEL effective interest 6%). EEL subseuqently increased their stake to 9% but 0.25% was aside for a "partner". Total cost to EEL was US$9.05M and is fully paid. 3D seismic is already available for the block. Gross prospective recoverable resources are stated in the NSAI report (Click here) to be 1,349 mmbbls oil and 1.9 Tcf gas from 4 prospects (unrisked). Unrisked resources net to EEL are 121 mmbbls oil and 168 bcf gas (based on 9% share). A rig has been contracted to drill a well in 2009, with US$3M set aside as their share of costs (max rig cost is US$410K/day, or $37K/day net). The Obo-1 well recently drilled in JDZ Block 1 encountered hydrocarbons.
What is ERHE's cut of Block two?
Am I missing something or is it around 294 million barrels.
That is 134 mmbls/9% implies 294mmbls/22%
Recent ERHE News
- Form SC 13G - Statement of acquisition of beneficial ownership by individuals • Edgar (US Regulatory) • 02/06/2024 07:31:22 PM
- Form 8-K - Current report • Edgar (US Regulatory) • 12/08/2023 09:06:42 PM
Mass Megawatts Announces $220,500 Debt Cancellation Agreement to Improve Financing and Sales of a New Product to be Announced on July 11 • MMMW • Jun 28, 2024 7:30 AM
VAYK Exited Caribbean Investments for $320,000 Profit • VAYK • Jun 27, 2024 9:00 AM
North Bay Resources Announces Successful Flotation Cell Test at Bishop Gold Mill, Inyo County, California • NBRI • Jun 27, 2024 9:00 AM
Branded Legacy, Inc. and Hemp Emu Announce Strategic Partnership to Enhance CBD Product Manufacturing • BLEG • Jun 27, 2024 8:30 AM
POET Wins "Best Optical AI Solution" in 2024 AI Breakthrough Awards Program • POET • Jun 26, 2024 10:09 AM
HealthLynked Promotes Bill Crupi to Chief Operating Officer • HLYK • Jun 26, 2024 8:00 AM