![](http://investorshub.advfn.com/images/default_ih_profile2_4848.jpg?cb=0)
Wednesday, December 05, 2007 10:15:48 PM
Table 1
Recent 2007 Drilling Results, Hill Copper-Zinc Project (South
Courtland Area)
----------------------------------------------------------------------
Drill Hole From To Length Zinc Copper Silver
----------------------------------------------------------------------
BR07-30 105 ft 405 ft 300 ft 1.30% 0.12% 1.7 gr/MT(a)
----------------------------------------------------------------------
Including: 245 ft 405 ft 160 ft 1.88% 0.14% 1.8 gr/MT
----------------------------------------------------------------------
----------------------------------------------------------------------
BR07-31 75 ft 200 ft 125 ft 0.88% 0.32% 4.6 gr/MT
----------------------------------------------------------------------
Including: 145 ft 200 ft 55 ft 1.83% 0.53% 3.6 gr/MT
----------------------------------------------------------------------
(a) grams per metric ton (which equals parts per million)
BR07-30 successfully tested the projection to depth of an earlier intercept encountered in drill hole BR07-04. BR07-31 was a step-out hole that tested an upward projection of a mineralized zone intercepted in hole BR07-16.
Drill hole BR07-29 was drilled into a copper-rich area within the South Courtland deposit. These results are shown in Table 2.
-0-
Table 2
Recent 2007 Drilling Results, Hill Copper-Zinc Project (South
Courtland Area)
----------------------------------------------------------------------
Drill Hole From To Length Copper Zinc Silver
----------------------------------------------------------------------
BR07-29 395 ft 535 ft 140 ft 0.34% 0.03% 0.5 gr/MT
----------------------------------------------------------------------
----------------------------------------------------------------------
Also: 105 ft 215 ft 110 ft 0.42% 0.01% 1.0 gr/MT
----------------------------------------------------------------------
Including: 115 ft 140 ft 25 ft 1.42% 0.21% 1.4 gr/MT
----------------------------------------------------------------------
----------------------------------------------------------------------
Also: 315 ft 335 ft 20 ft 0.52% 0.05% 0.7 gr/MT
----------------------------------------------------------------------
BR07-29 bottomed in mineralized material, with the final five-foot assay interval grading 0.58% copper; the Company plans to re-drill and deepen this hole at a future date.
Lightning cracks the blackened sky,
Hear the thunder chariot ride
All brave men with hearts of war
Ride the path of mighty Thor
Glidelogic Corp. Becomes TikTok Shop Partner, Opening a New Chapter in E-commerce Services • GDLG • Jul 5, 2024 7:09 AM
Freedom Holdings Corporate Update; Announces Management Has Signed Letter of Intent • FHLD • Jul 3, 2024 9:00 AM
EWRC's 21 Moves Gaming Studios Moves to SONY Pictures Studios and Green Lights Development of a Third Upcoming Game • EWRC • Jul 2, 2024 8:00 AM
BNCM and DELEX Healthcare Group Announce Strategic Merger to Drive Expansion and Growth • BNCM • Jul 2, 2024 7:19 AM
NUBURU Announces Upcoming TV Interview Featuring CEO Brian Knaley on Fox Business, Bloomberg TV, and Newsmax TV as Sponsored Programming • BURU • Jul 1, 2024 1:57 PM
Mass Megawatts Announces $220,500 Debt Cancellation Agreement to Improve Financing and Sales of a New Product to be Announced on July 11 • MMMW • Jun 28, 2024 7:30 AM