Re: NYBob post# 8814

Tuesday, 08/21/2007 7:09:23 PM

Tuesday, August 21, 2007 7:09:23 PM

Post# of 17016
In March 2006, Deer Trail Mining Company, LLC -
entered into an agreement with -
Behre Dolbear and Company (USA), Inc.
to conduct geological services and consulting at -
Unico's Deer Trail Mine in Marysvale, Utah.

The focus of Behre Dolbear's work -
is related to the underground diamond core drilling program
undertaken at the Deer Trail Mine in 2005.

Behre Dolbear -
is currently performing the geological core -
logging and spitting verification on the samples and -
overseeing the shipment of those samples to -
ALS Chemex for analysis.

Analysis or Plan of Operation -
Last Update: Jul 16, 2007 -

Behre Dolbear has also been contracted to report on -
the mineralization and provide additional technical advice
on the project as desired by
Deer Trail Mining Company, LLC.

Behre Dolbear and Company (USA)
has issued the following information from
the Interim Summary Report
on their work completed thus far.

The report from Behre Dolbear states:
"Unico, Incorporated drilled 7,235 feet of BQ diameter core
at various inclinations and azimuths from four drill stations
in the Patrick Thomas Henry (PTH) adit at -
the Deer Trail Mine -
from December 2004 to April 2005.
At that time, the core was not logged in detail
and no analyses were done.

Table 1 summarizes the drilling statistics.
The station locations are defined based on the approximate
footage from the PTH adit portal.

Table 1
Unico Phase II Drill Holes
UDDH Drill Station Inclination Azimuth Total Length
Hole # Location (in degrees) (Feet)
1* 4400 -45 102 740
2 4400 -40 102 648
3* 4400 -42 92 782
4* 4400 -42 150 554
5* 4400 -55 102 664
6 4400 -45 21 409
7 4400 -58 298 733
8 4400 -75 300 565
9* 4700 -45 116 460
10 4900 -75 0 460
11* 3400 +45 258 454
12* 3400 +45 162 355
13* 3400 -65 125 420
Total Footage 7,235


*Logged by Behre Dolbear
Behre Dolbear & Company (USA), Inc.
(Behre Dolbear) contracted with Unico in March 2006
to geologically log the core, select intervals
for analyses and assays, supervise the sawing of
the selected intervals, submit those samples to a
laboratory for analyses, opine on the mineralization
observed, and provide technical advice to Unico.

Between March 23, 2006 and October 6, 2006,
Behre Dolbear logged in detail 4,429 feet of core
from the eight holes indicated in Table1.

A total of 550 samples totaling 611 feet of core
containing trace to significant mineralization from
six of the holes (UDDH 1, 5, 9, 11, 12, and 13)
has been selected, sawed, submitted for analyses
and assays, and the results received and evaluated.

Analyses are pending from 228 samples -
from 385 feet of core in UDDH 3.
UDDH 4 has been logged, but sample intervals
have not been selected.
ALS Chemex (Chemex) did the analyses and assays at
its laboratory in North Vancouver, British Columbia.

Sample preparation, analyses, and assays were done
as requested by Behre Dolbear using Chemex's standard
protocols.

Gold was determined by fire assay with an atomic
absorption spectrometry (AAS) finish.

All samples were also analyzed for a 34-element suite of major and potentially significant trace elements using an
aqua regia digestion and an emission spectrographic scan.

Chemex's quality control-quality assurance system complies
with the requirements of the international standards
ISO 90001:2000 and ISO17025:1999.

http://www.dolbear.com/index.htm

fwiw -
make sure to do your own dd....
http://www.unicomining.com./index.php
Imo. Tia.

God Bless

http://investorshub.advfn.com/boards/read_msg.asp?message_id=22252396

http://investorshub.advfn.com/boards/read_msg.asp?message_id=22186818





Join the InvestorsHub Community

Register for free to join our community of investors and share your ideas. You will also get access to streaming quotes, interactive charts, trades, portfolio, live options flow and more tools.