InvestorsHub Logo
Followers 1081
Posts 107741
Boards Moderated 55
Alias Born 11/22/2003

Re: NYBob post# 26

Tuesday, 07/31/2007 12:32:09 PM

Tuesday, July 31, 2007 12:32:09 PM

Post# of 79
Freegold Drilling Hits 50.2 g/t, 34.8 g/t, and 21.9 g/t Au
in Significant Beistline Area Expansion at Golden Summit
Tuesday July 31, 3:01 am ET
VANCOUVER, July 31 /CNW/ -

Freegold Ventures Limited -
(the "Company") is pleased to announce the discovery of a new
swarm of parallel veins and shear zones hosting high-grade
surface gold mineralization on the eastern end of
the Cleary Hill area at the Golden Summit project
outside Fairbanks, Alaska.

Recent drilling and bulk sampling in the area of the Beistline
shaft has identified 4 parallel east-west trending structures
to date over a width of 175 feet.

Two of the structures have been traced over a strike length
of 860 feet and remain open in both directions.

Significant gold mineralization has also been intersected
between the first two structures in the form of linking
shears and ladder structures.

Results from the 2006 trenching suggest that this new vein
swarm may extend up to 400 feet in width, and represents
an attractive target for the delineation of bulk tonnage
gold mineralization, similar to the multiple 150 to
300 foot wide vein/shear systems identified in shallow,
closed spaced drilling over a 5,000 foot strike length
further to the west.

The high-grade mineralization intersected in recent drilling
in this area is currently being bulk sampled and stockpiled
and will be added to the plant feed this fall once the
Company's on-site 1,200 ton per day gravity plant is fully
commissioned within the coming weeks.

Bulk sampling in this Beistline area in the fall of 2006 consisted of the extraction of approximately 2,800 tons of material from the main Beistline structure, and an additional 3,300 tons of bleed mineralization, which was collected principally from the hanging wall of this same structure. The final excavation in this area was a sample pit approximately 300 feet long, 30 feet wide and 30 feet deep. These 6,100 tons (in addition to 3,900 tons collected from 6 other areas on the property) are expected to be crushed, sampled and processed in August.

The first new extension of mineralization in this area was identified during the recent construction of a ramp into the previous pit area. This ramp uncovered the main Beistline structure over an additional 560 feet of strike length to the west with no visible offset by crossing faults. In order to determine gold grades within this 65 degree dipping structure and within the immediate hanging wall, a series of shallow vertical holes were drilled on 10-foot spacing, to a maximum depth of 78 feet. These holes, which tested the first 300 foot westward extension of the main structure from the previous pit limit, successfully intersected numerous high-grade zones in the 10 g/t to 50 g/t range, which were often surrounded by wider zones of lower grade mineralization. Significant assays from the drilling which tested the Beistline structure include:

-------------------------------------------------------------------------
Thick- Gold Gold
Hole From To ness Grade Grade
Number (foot) (foot) (feet) (g/tonne) (oz/ton) Description
-------------------------------------------------------------------------
447 12 27 15 16.13 0.47 Beistline hanging wall
-------------------------------------------------------------------------
including 15 27 12 19.55 0.57 Beistline hanging wall
-------------------------------------------------------------------------
including 24 27 3 50.15 1.46 Beistline hanging wall
-------------------------------------------------------------------------
449 0 78 78 1.95 0.06 Beistline hanging wall
-------------------------------------------------------------------------
including 3 33 30 4.42 0.13 Beistline hanging wall
-------------------------------------------------------------------------
including 15 21 6 15.81 0.46 Beistline hanging wall
-------------------------------------------------------------------------
450 0 78 78 1.52 0.04 Beistline hanging wall
-------------------------------------------------------------------------
including 3 24 21 4.62 0.13 Beistline hanging wall
-------------------------------------------------------------------------
including 15 21 6 12.66 0.37 Beistline hanging wall
-------------------------------------------------------------------------
451 0 78 78 1.68 0.05 Beistline hanging wall
-------------------------------------------------------------------------
including 0 27 27 4.17 0.12 Beistline hanging wall
-------------------------------------------------------------------------
Including 15 18 3 21.88 0.64 Beistline hanging wall
-------------------------------------------------------------------------
453 3 6 3 11.13 0.32 Beistline hanging wall
-------------------------------------------------------------------------
454 0 78 78 2.08 0.06 Beistline hanging wall
-------------------------------------------------------------------------
Including 0 6 6 14.68 0.43 Beistline hanging wall
-------------------------------------------------------------------------
Including 21 30 9 5.27 0.15 Beistline hanging wall
-------------------------------------------------------------------------
455 0 78 78 1.81 0.05 Beistline hanging wall
-------------------------------------------------------------------------
Including 24 27 3 34.80 1.02 Beistline hanging wall
-------------------------------------------------------------------------
456 6 9 3 12.95 0.38 Beistline hanging wall
-------------------------------------------------------------------------
473 0 12 12 2.74 0.08 Beistline hanging wall
-------------------------------------------------------------------------
474 0 12 12 2.28 0.07 Beistline hanging wall
-------------------------------------------------------------------------


Previous drilling from Fence 9 (reported on July 11, 2007) intersected 33.95 g/t and 22.65 g/t over 3-foot intervals in holes 347 and 350. These intercepts coincide with a 15 foot-wide surface channel sample, which averaged 22.3 g/t last year in this same area, with the center 5-foot sample returning 53.93 g/t. This was originally interpreted as further bleeding of mineralization from the main Beistline structure. Excavation of the first cut of a new larger bulk sample pit has now identified four separate structures (Beistline, B1, B2 and B3) within the 200-foot wide area cleared to date, and the Fence 9 drilling is now seen to have intersected the separate B2 structure which has now been traced in drill holes and surface exposures over a strike length of 375 feet.

Drill results from additional shallow drilling that tested the gold mineralization within the B1 structure, located approximately 73 feet further south from the main Beistline structure, just outside the limits of the initial bulk sample, pit have now been received. In addition to mineralization within the B1 structure, which ranges in true width from 1 to over 8.5 feet, additional gold mineralization was intersected in shears and ladder structures that appear to link the Beistline and B1 structures. These are believed to be tension openings caused by the stronger faulting localized on these two structures. Significant assays that tested the mineralization in this area include:

-------------------------------------------------------------------------
Thick- Gold Gold
Hole From To ness Grade Grade
Number (foot) (foot) (feet) (g/tonne) (oz/ton) Description
-------------------------------------------------------------------------
399 54 57 3 10.38 0.30 Bleed between
Beistline and B1
-------------------------------------------------------------------------
400 45 57 12 2.06 0.06 Bleed between
Beistline and B1
-------------------------------------------------------------------------
401 18 30 12 3.79 0.11 Bleed between
Beistline and B1
-------------------------------------------------------------------------
402 15 45 30 3.47 0.10 Bleed between
Beistline and B1
-------------------------------------------------------------------------
Including 18 27 9 5.30 0.15 Bleed between
Beistline and B1
-------------------------------------------------------------------------
403 15 39 24 3.22 0.09 Bleed between
Beistline and B1
-------------------------------------------------------------------------
Including 30 33 3 16.10 0.47 Bleed between
Beistline and B1
-------------------------------------------------------------------------
404 0 42 42 1.23 0.04 Bleed between
Beistline and B1
-------------------------------------------------------------------------
405 0 33 33 1.80 0.05 Bleed between
Beistline and B1
-------------------------------------------------------------------------
426 60 78 18 1.49 0.04 Bleed between
Beistline and B1
-------------------------------------------------------------------------
448 0 21 21 3.85 0.11 Bleed between
Beistline and B1
-------------------------------------------------------------------------
Including 12 18 6 11.00 0.32 Bleed between
Beistline and B1
-------------------------------------------------------------------------
420 0 18 18 4.76 0.14 B1 structure
-------------------------------------------------------------------------
421 3 21 18 2.36 0.07 B1 structure
-------------------------------------------------------------------------
424 18 27 9 2.79 0.08 B1 structure
-------------------------------------------------------------------------
436 15 36 21 1.55 0.05 B1 structure
-------------------------------------------------------------------------
437 15 36 21 1.31 0.04 B1 structure
-------------------------------------------------------------------------
438 15 33 18 1.63 0.05 B1 structure
-------------------------------------------------------------------------
439 12 27 15 1.70 0.05 B1 structure
-------------------------------------------------------------------------


During the stripping of overburden a further 100 feet south of drill Fence 9, a fourth structure (B3) has been partially uncovered over a length of 250 feet. This structure also appears to strike parallel to the main Beistline structure. Shallow bulk sample definition drilling in this area is expected to commence in late September, following the completion of step-out drilling currently being undertaken in the Tolovana area, following up on the positive drill results reported on June 11, 2007.

Gold mineralization in this eastern end of the historic Cleary Hill mine area remains open in all directions, with the main Beistline and B1 structures having been traced with drill holes, trenching, bulk sample excavation, and stripping over a distance of 860 feet. While the current geological model has gold mineralization hosted in a series of parallel structures similar to the Wackwitz-Currey vein swarm south of the old Cleary Hill mine workings, it is unclear how far south these repetitive Beistline area structures may extend.

Freegold President and C.E.O. Steve Manz stated "With this latest discovery of a new vein swarm on the eastern end of the Cleary Hill system, and the identification to date of multiple 100 to 300 foot wide mineralized zones that have been traced over a minimum of 5,000 feet of strike length, Golden Summit continues to grow as a property capable of hosting large tonnages of bulk mineable gold mineralization. While the shallow drilling and bulk sampling programs are instrumental in building our knowledge base, and while the commencement of our first gold production and cash flow from the property is an ideal way to capitalize on the extensive high grade gold mineralization that we have been steadily discovering at surface, we believe that the true potential of the project will be brought out with the initiation of systematic deeper drilling for resource building purposes that we are intending to commence this fall."

Drilling is currently being conducted with an Ingersol-Rand conventional percussion drill. Cuttings are returned up the drill hole with the use of an OEM vacuum drill cuttings collector, and are dropped from a cyclone directly into a sample bag. Samples are collected every three feet, with the drill bit being pulled off the bottom and the hole cleaned at the completion of each sample interval. Freegold maintains a geologist and sampler at the drill rig for all drilling to take and log all samples to insure that quality assurance and control procedures are in accordance with 43-101 requirements. One duplicate assay is being conducted in every drill hole and either a blank or a standard is inserted in the sample stream every 10 samples. Alaska Assay Laboratories in Fairbanks, Alaska is being used to analyze the drill cuttings for gold via fire assay analysis plus multi element ICP-AES and ICP-MS analysis using 4 acid digestion.

The Qualified Person for this release is Michael P. Gross, M.S., P. Geo., VP Exploration, Freegold Ventures Limited.

About Freegold Ventures Limited

Freegold Ventures Limited is a North American exploration and development company with a new management team experienced in mine development and production that is actively exploring advanced-stage gold projects in Idaho and Alaska. Freegold holds a 100% lease interest in the Almaden gold project in Idaho. This large tonnage epithermal gold deposit was the subject of a feasibility study in 1997 calling for the development of a 95,000 oz/year open pit, heap leach mine. Freegold is currently finalizing a 34,000-foot drilling program aimed at further expanding the size of the resource prior to undertaking new economic evaluations in 2007. Drilling at depth and to the north and south of the known mineralization is continuing to identify new extensions to the deposit. Freegold is continuing to discover new high-grade veins and bulk tonnage shear zones in its 25,000-foot drill program at its Golden Summit project outside Fairbanks, Alaska. Gold production from the processing of an initial 10,000-ton bulk sample collected in the fall of 2006, along with additional bulk sampling/processing of additional areas containing surface high grade gold mineralization will commence shortly. Drilling to outline larger, lower grade bulk tonnage targets on the property will continue throughout the year. Freegold has also optioned the Vinasale Gold Deposit in Alaska, from Doyon, Limited, where geophysical, mapping and sampling programs will be carried out on the property in 2007.

On behalf of the Board of Directors

"Steve Manz"


Steve Manz
President and C.E.O.

The TSX has neither approved nor disapproved the contents of this news
release. CUSIP: 45953B107

DISCLAIMER


This news release contains certain "Forward-Looking Statements" within the meaning of Section 21E of the United States Securities Exchange Act of 1934, as amended. All statements, other than statements of historical fact, included herein are forward-looking statements that involve various risks and uncertainties. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from the Company's expectations are disclosed in the Company's documents filed from time to time with the Toronto Stock Exchange, British Columbia Securities Commission and the United States Securities & Exchange Commission.

For further information

Kristina Walcott -
VP Corporate Development,
(604) 685-1870,
1-800-667-1870,
jkw@freegoldventures.com


http://biz.yahoo.com/cnw/070731/freegold_ventures_ltd.html?.v=1&printer=1

http://www.investorshub.com/boards/board.asp?board_id=6526

http://siliconinvestor.advfn.com/subject.aspx?subjectid=57008



Source: Freegold Ventures Limited


Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent FVL News