741 watts = 1 horsepower... the ballmill is 200hp, the substation is 3 megawatts de-rated to 2.5 megawatts due to the permitting. fun question is the other ballmills. the real fun question is why there is a second slab going in next to the substation. Or were you too stupid to get the cell phone number of the dude heading up the refurb job at the site? Or to dumb to track down the electrical engineer for the project at BNA and his direct line? Or to dumb to chat with the Managing Director of Construction at Rocky Mountain Power? Or to dumb to find out the bottleneck in restarting the production? Or to dumb to get a hold of the chick at corporate that pays all of the invoices? Yes I am the resident dumb ass.