InvestorsHub Logo
Followers 11
Posts 14013
Boards Moderated 1
Alias Born 06/06/2006

Re: None

Thursday, 04/25/2024 11:51:59 PM

Thursday, April 25, 2024 11:51:59 PM

Post# of 56716
More of Sano's LIES exposed by AISI, well done

Because I said that the design of the AOT is to slow crude oil as it passes through the AOT for proper treatment you are now saying::

So Aot is now a bottle neck right after exiting a pump station’s 3500 hp turbulent outflow? I’d stop now if I was you



No bottleneck. We had this same discussion 8 months ago. You either can't remember, can't grasp the concept, or are just making stupid arguments for the fun of it. Another waste of my time.

From a post 8 months ago:
If we use the TransCanada XL pipeline AOT installation as an example we can see the real story. The TC pipeline had a 36 inch diameter capable of moving 830,000 bpd. To accommodate that size line a skid of 4 AOTs was installed. Each of the four AOTs has an inside diameter of 36 inches. The whole point of installing multiple AOTs after each pumping station was to slow the flow of oil inside the AOT to allow adequate time for treatment to be effective without reducing the overall volume of the pipeline.




If you couldn't grasp the concept I was going to suggest you ask PumpersExposed for help, but I can see he doesn't get it either.

I've wasted enough time on you now. Good-bye.

Bullish
Bullish