InvestorsHub Logo
Followers 2
Posts 849
Boards Moderated 1
Alias Born 08/24/2023

Re: None

Tuesday, 04/23/2024 6:42:44 PM

Tuesday, April 23, 2024 6:42:44 PM

Post# of 96
TODAY: AMQ completes Phase 1 drilling @ its B26 Deposit, revealing 2.6% Copper Eq over 37.0m and 5.35% CuEq over 8.1m. Follow-up plans include 50,000m drilling, updated resource model & advanced surveys. + At its Beschefer Gold Project AMQ has drilled 5 holes so far with high-grade intercepts like 55.63 g/t Au over 5.57m.
https://abitibimetals.com/abitibi-successfully-completes-first-phase-of-50000-metre-drill-program-at-the-b26-polymetallic-deposit-assays-from-34-holes-pending/
Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent AMQFF News