InvestorsHub Logo
Followers 110
Posts 11910
Boards Moderated 3
Alias Born 01/29/2015

Re: KICK1 post# 19118

Wednesday, 04/10/2024 8:12:15 AM

Wednesday, April 10, 2024 8:12:15 AM

Post# of 19642
Yes, shorts are terrified. New money pouring in on great drilling results that may force a squeeze.

Hycroft Infrastructure is in place and ready to restart.

$1.2Billion invested, preparing for massive commercial operation.

A second Refinery is under construction with everything in place. This is a massive commercial operation.

Hycroft is expected to have a workforce of over 500 when it's said a done. All infrastructure is prepared, in place and ready.











































Hycroft Mine Expansion Winnemucca, Nevada

SMG provided conceptual, final mechanical and structural engineering and design of belt conveyors including transfer structures and chutes. A fast-track schedule and changing priorities required quick SMG responses to complete engineering on schedule.


http://www.smgengr.com/material-handling-systems.html

A fast-track schedule and changing priorities required quick SMG responses to complete engineering on schedule.


Massive belt conveyors including transfer structures and chutes.


CEO Diane Garrett said; We have a tremendous amount of infrastructure already on site at Hycroft Mining Holding Corporation – infrastructure that, if planned and purchased today, would exceed well over a billion dollars. That advantage means we’re ahead of the curve of a typical developer.


https://www.linkedin.com/company/hycroftmining

SMG massive conveyor system.
http://www.smgengr.com/material-handling-systems.html

Hycroft Mining: Infrastructure and Equipment Owned by Hycroft



Bullish
Bullish
Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent HYMC News