New Tweet... Conversation Nate's Food Co. (OTC:NHMD) @natesfoodco
We had to extend our TSR to 7-days to secure the crucial Pipeline Codes and Transfer Station No. as per our supplier's requirements. The TSR was received and sent to our supplier. Now, everyone can prepare for the fuel injection into tanks.

$NHMD
Lauren J Beckwith
@lbeckwith8018
·
2h
$NHMD Did the supplier send you the SGS report now that this was done. I'm assuming the supplier already checked the location of the tanks & this was their final request before sending the SGS report?
Nate's Food Co. (OTC:NHMD)
@natesfoodco
The refinery needed the terminal # and pipeline codes before giving final approval and sending over the SGS and other product documents. So to get those we needed to extend the TSR to 7-days (from the 3-days previously) which we did at a cost of $350,000.