InvestorsHub Logo
Followers 971
Posts 383038
Boards Moderated 5
Alias Born 06/24/2011

Re: None

Monday, 11/27/2023 1:42:26 PM

Monday, November 27, 2023 1:42:26 PM

Post# of 715
At the Volt Canyon Lithium Project, the Company contracted the services of Rangefront Geological (“Rangefront”) to perform a detailed soil sampling on a 100 m X 100 m spacing as a first phase of the Company’s exploration plan on site. The Company proposes to use the results of these soil samples, together with a planned second-phase exploration program involving geophysical surveys of the property, to help predict geological structure and possible locations for lithium accumulation. Once the first two phases of this exploration program at Volt Canyon have been successfully completed, the Company will determine the next steps for its overall exploration plan. This may include, but is not limited to, a subsequent drilling program.
Bullish
Bullish