Friday, May 19, 2023 9:37:26 AM
WELL: Bayhanli-2
Progress: 259 meters
Measured Depth: 3425 metres
Week Summary:
Drill out and drill new 8 ½” hole to 3425 metres
Run in 7” casing and cement
Run in with scraper, bristle brush and Magnostar assemblage
Further Activities:
Clean and scrap 7” casing
Run in with tubing and packer
Perforate, test and turn over to production department
This well had about 44 metres of gas pay. The lower E sand had about 14 metres and will most likely be the first zone to perforate and put on production. Mid next week the well should be perforated and tested.
Hear Colin Robson, VP of Corporate Development speak about this news:
https://stockhouse.com/news/press-releases/2023/05/17/trillion-energy-announces-43-metres-of-gas-pay-in-bayhanli-2-well-at-sasb-gas
Axis Technologies Group and Carbonis Forge Ahead with New Digital Carbon Credit Technology • AXTG • Apr 24, 2024 3:00 AM
North Bay Resources Announces Successful Equipment Test at Bishop Gold Mill, Inyo County, California • NBRI • Apr 23, 2024 9:41 AM
Epazz, Inc.: CryObo, Inc. solar Bitcoin operations will issue tokens • EPAZ • Apr 23, 2024 9:20 AM
Avant Technologies Launches Advanced AI Supercomputing Network and Expansive Data Solutions • AVAI • Apr 23, 2024 8:00 AM
BestGrowthStocks.com Issues Comprehensive Analysis of Triller Merger with AGBA Group Holding Limited • AGBA • Apr 22, 2024 1:00 PM
Cannabix Technologies to Present Marijuana Breathalyzer Technology at International Association for Chemical Testing (IACT) Conference in California • BLO • Apr 22, 2024 8:49 AM