InvestorsHub Logo
Followers 39
Posts 2154
Boards Moderated 0
Alias Born 09/15/2009

Re: None

Saturday, 02/25/2023 9:17:06 AM

Saturday, February 25, 2023 9:17:06 AM

Post# of 1253
The start of construction of the new High Pressure Pipeline to #WestMacedonia was marked by a special event organized by #DESFA on Thursday, 23 February, in Kozani, in the presence of the Regional Governor of #WesternMacedonia, George Kasapidis, the Mayor of #Kozani, Lazaros Maloutas, representatives of the local administration and local authorities, as well as DESFA’s partners in the project Prometheus Gas S.A. , #DamcoEnergy, AVAX GROUP, CORINTH PIPEWORKS, C&M Engineering S.A.,Asprofos Engineering, and Moody Tottrup Hellas S.A.

The new 160-kilometer pipeline, with a budget of €163 million, brings the regions of Central and Western Macedonia to a new #energy era, ensuring their smooth energy transition while enabling them to play a leading role in the country’s future #decarbonized energy system, as it will be the first pipeline in #Greece and one of the first at European level capable of transporting up to 100% #hydrogen.

The event was followed by visit to the pipe yard of the project, where the first 24 kilometers of pipes for the construction of the pipeline have already been transferred. #desfa #pipelinetowestmacedonia #energytransition #infrastructure #project

Learn more ??
https://bit.ly/3kxct1k

maria rita galli Andreas Diamandopoulos Konstantinos Mitzalis Antonis Mitzalis George Tasakos George Manis Ilias Bekiros Theodoros Apostolopoulos Danilatos Konstantinos Athanasios Tazedakis Ioannis Chomatas sophia michelaki Vasiliki Papadopoulou Foteini Zannetopoulou


Start of Construction Works on the Pipeline to Western Macedonia
https://www.desfa.gr/en/press-center/press-releases/desfa-enarjh-twn-ergwn-kataskeyhs-toy-agwgoy-pros-th-dytikh-makedonia
Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent ADN News